# Moving from vSphere to Azure: The Pre-Flight Check

> Avoid migration failures. Establish hardware baselines, map dependencies, and draft rollback runbooks before moving workloads.

- Author: Matthias Goodman
- Category: Strategy
- Published: 2026-01-20
- Updated: 2026-01-20
- Tags: vSphere, Azure, cloud migration, network readiness, pre-flight checklist
- Canonical HTML: https://www.genericservice.app/notes/migration-readiness
- Section LLM Index: https://www.genericservice.app/notes/llms.txt

Migration tools work fine until they don't. The network is usually the problem. This pre-flight checklist exists to prove the path before you schedule a [vSphere-to-Azure cutover](/services/migration).

> **Outcome:** Pre-flight checklist proves network readiness, data fit, and dependency mapping before any cutover attempt.

-

## Pre-flight means proving the path

The process involves moving an application's entire dependency chain rather than just migrating compute. If the path is not measured, the timeline is fiction.

## The pre-flight checklist

1. **Baseline latency, jitter, and throughput.** Measure round-trip latency and sustained throughput between the source cluster and the Azure landing zone.

2. **Data transfer math.** Calculate the data volume, change rate, and the cutover window. If the numbers do not fit, plan a seeded transfer and a delta sync.

3. **Dependency map (inbound and outbound).** Inventory services, ports, DNS names, and IP ranges the workloads touch.

4. **IP, routing, and firewall rules.** Check for address overlap, NAT requirements, and route propagation. Confirm firewall rules with a practical test flow rather than a screenshot.

5. **Identity and DNS cutover logic.** Document where identity lives (AD or Entra), which DNS zones are authoritative, and the TTL strategy.

6. **Rollback plan (the "revert" button is a lie).** Define the point of no return, data divergence handling, and the exact steps to go back. Test rollback in a staging window.

7. **Application validation steps.** Define the exact smoke tests that prove the workload is healthy. Assign an owner and capture pass/fail criteria.

8. **Evidence pack.** Capture diagrams, test results, and the runbook in one place.

![Cutover window and deterministic rollback timeline from T-48h pre-staging through the T+90m smoke-test decision gate to T+2h commit or failback.](/images/notes/vsphere-azure-cutover-rollback-window.svg)

## Stop and fix before cutover

- Latency variance is unstable or packet loss appears under load.
- Any dependency is still "maybe" or "we think."
- Rollback steps are incomplete or untested.

-

> **Stability Principle**
>
> **Cutover primarily tests the network rather than the migration tool itself.** If the path is not measured, the cutover plan is a guess.